Black Dog Wear – Long Lead Regular (4.8 metre)

Long Lead 4.8mtr Green
Black Dog Wear Lead 4.8 metre length great for walks in the sun and along the beach, great for training recallBlack Dog Wear Lead 4.8 metre length great for walks in the sun and along the beach, great for training recallBlack Dog Wear Lead 4.8 metre length great for walks in the sun and along the beach, great for training recallBlack Dog Wear Lead 4.8 metre length great for walks in the sun and along the beach, great for training recallBlack Dog Wear Lead 4.8 metre length great for walks in the sun and along the beach, great for training recallBlack Dog Wear Lead 4.8 metre length great for walks in the sun and along the beach, great for training recall

$29.95 inc GST

Long lead – 4.8 metres.

Product Description

For training dogs on Recall, or allowing dogs a roam in the park, or the beach, while still maintaining lead control.  Folds neatly to hang conveniently from belt loop when not in use.

20mm wide, (aprox) 4.8 Meters long, Medium Snap Hook.

 

Additional Information

Colour

Black, Red, Blue, Green, Pink, Purple

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.